The Contra Costa County Regional Alternative Compliance (RAC) System is a collaborative initiative partnership funded by the U.S. Environmental Protection Agency (EPA) through the San Francisco Bay Water Quality Improvement Fund. The RAC System was created to help local entities comply with the rigorous post-construction stormwater treatment requirements outlined in Provision C.3 of the San Francisco Bay Region Municipal Regional Stormwater Permit (MRP).
Many development and redevelopment projects face challenges in meeting stormwater treatment requirements due to site constraints, high costs, and concentrated legacy pollution in certain areas. Traditional approaches often require distributed green stormwater infrastructure (GSI), which can be expensive and difficult to maintain. The RAC System offers a flexible, cost-effective, and scientifically defensible alternative by allowing required stormwater treatment to be implemented off-site.
The RAC System enables the construction of regional GSI treatment facilities—called Off-Site GSI Projects—within Contra Costa County. These projects generate “compliance units,” which can be bought and sold through the RAC System. Developers, municipalities, and other parties that need stormwater compliance can purchase these units to meet their regulatory requirements. Sellers design and construct Off-Site GSI Projects, which must be certified by the RAC System before units can be sold. Buyers pay for compliance units and an annual fee to cover ongoing operations and maintenance (O&M) of the facilities.
The RAC System was developed with input from local permittees, an advisory committee representing nine Bay Area counties, Caltrans, the Port of Oakland, the Water Quality Control Board, and EPA. It is legally enabled under MRP Provision C.3.e “alternative compliance” and is subject to ongoing reporting and verification requirements. The RAC System is managed by the RAC Joint Powers Authority (JPA).